Gut-job baths, kitchen relocations, laundry moves, accessibility retrofits — the water and waste side of whatever your GC or designer is running.
Typical scheduling window once plans are final. Faster for single-fixture swaps, longer for full gut jobs needing material lead time.
Two site visits for most remodels — rough-in before drywall, trim-out after tile and finish carpentry. We hand your GC a punch-ready room.
Scope changes get a written price before the work happens. No surprise line items on the final invoice.
We work under your GC or straight with the homeowner. Either way you get clear scheduling and a single point of contact.
We stage the work so your house isn’t dry for more than half a day at a time unless the scope requires it — and we’ll warn you in advance if it does.
Every job starts with a real walk-through. We tell you what we see, what it needs, and what it costs — before the tools come out.
We answer. You describe the problem. We triage emergency vs. scheduled.
A Miller plumber walks the job and explains what’s actually going on.
Clear written estimate before any work starts. No surprise invoices.
We do the job, clean up, and only leave when the water’s behaving.